DEVELOPMENT PLAN
With the mass participation of the Lothas and in remembrance of the great missionary work done in spreading Christianity through this Vankhosung Mission Compound, the general public decided to Re-build this College as a thanks giving to almighty God.
To begin the work, the KBES constituted Development and Master Plan Committees to prepare a DETAILED PROJECT REPORT. The KBES Development and Master Plan Committees brought out the Master Plan for the development of the of the College Campus under the Technical quidance of Mr. Mhathüng Yanthan Deputy Director (Land Resources). Mr. Zanbemo Ngullie Sr. Town Planner TCP Dpt, Ar. Myingthüngo Yanthan HUDCO Ar. Chenithüng Yanthan TCP Dpt, , Er. Thüngdemo Patton Executive Engineer (Tourism), Foundation Stone of the Witter Bible College (New Campus) was laid by Mr. Alan Lee Lucas of USA and Dedicated by Rev. Grace E. Noone of USA on 18th. December, 2006
The preliminary development plan prepared with assistance of Planners, Architects and Engineers, Supported by Donors, KBRS Staff, Pastors, Church Members, friends and well wishers both within and abroad and members of all the churches under this Association.
SITE LOCATION
The beautiful hillock of Vankhosüng is the Proposed Site for Witter Bible Collegeunder Wokha District in the State of Nagaland ,India It is located at an altitude of 1,434.48 meters above sea level. It is situated on the Northern part of Wokha Town and on the foothill of the Legendary Mount Tiyi which is believed by all the Naga tribes as the abode of the Dead Souls. It was purchased by Dr. & Mrs. J. R. Bailly, an American Missionary to the Kyong, Naga area in the year 1928 from Tüngoe and Kikon clans of Wokha village. The area of the land measuring 50 Acres was purchased for a sum of Rs. 460 (Rupees four hundred sixty) only. As per the term of the Agreement as signed by Sir Pausey, the then Sub Divisional Officer of the British Mokokchung, the entire area of the land belonging to the KBES is free from all encumbrances, save for the condition that the Land Owners be given the privilege of undertaking manual labor in lieu of the land sold. Unfortunately, Dr. Bailly died at Calcutta when he went there to purchase CGI Sheets for construction of a Bungalow at Vankhosüng. As per the record, Late Shanjamo of Yikhm village donated a sum of Rs. 100 for the purchase of the land, Late Tsayio Kikon and Late Chümdemo Murry paid a sum of Re. 1 each to Late Rentsamo Tüngoe, G.B. of Wokha village for straightening the demarcation line when Overseer Metchul surveyed the land. Later on the Lotha (Kyong) Committee purchased the present Play ground from Late Khodemo Tüngoe for a sum of Rs. 15 and donated to the KBES for construction of a Play Ground. Now that the Football ground is shifted to the top of the hill, the KBES has a plan to convert the existing Playground into a Parking Zone and a Park (Flower Garden).
Site development under Progress
Proposed Development Plan
PLANS | TARGETED PROJECTS |
PLAN-1 | a) N/W - Construction of Approach Road from 0 Point KBES Mission Centre, Vankhosung to WBC (New Campus) = 700 mtrs > Completed b) N/W - Construction of W.B.M. Premise Carpeting from 0 Point KBES Mission Centre, Vankhosung to WBC (New Campus) =700 mtrs
|
PLAN-2 | a) N/W - Construction of Football-Cum-Public Gathering Ground at WBC (New Campus) > Completed. b) N/W - Construction of Rostrum at the Football-Cum-Public Gathering Ground at WBC (New Campus) c) N/W - Construction of Gallery and Protection Wall at the Football-Cum- Public Gathering Ground at WBC (New Campus)
|
PLAN-3 | N/W - Construction of the Administrative - Cum - College Block consisting of -
a) 6 (six) Class-rooms with 50 sitting capacity each initially ; b) A Library Hall with 500 sitting capacity and a minimum of 40,000 Volume of Books ; a) Principal's Office with P.A's Chamber (Toilet attached) ; b) Vice Principal's Office (Toilet attached) ; c) Deans Office (Toilet attached) ; d) Registrar's Office (Toilet attached) ; e) General Establishment (Toilet attached) ; f) Accountant/Cashier's Chamber (Toilet attached) ; g) Teacher's Common Room with 30 sitting capacity (Toilet attached) ; h) Reception Counter ; k) i) 1 Common Toiletry ; ii) Separate Toiletries for Boys & Girls ;
|
PLAN-4 | N/W - Boys Dormitory with accommodation capacity of 200 Students initially. |
PLAN-5 | N/W - Girl's Dormitory with accommodation capacity of 150 Students initially. |
PLAN-6 | N/W - Principal's Quarter. |
PLAN-7 | N/W - Staff Quarter Storied Building (Flat System) for 6 Families initially. |
PLAN-8 | N/W - Construction of Guest House (Inside the Campus) |
PLAN-9 | N/W - Construction of Rain Water Harvesting Projects. |
PLAN-10 | N/W - Staff Parking Zone (Inside the Campus) |
PLAN-11 | N/W - Public Parking Zone (Below the Approach Road) |
PLAN-12 | N/W - Construction of Footpath from Approach Road to the Administrative - Cum - College Block.
|
PLAN-13 | N/W - Required Public Amenities (Inside the Campus) |
PLAN-14 | N/W - 1 Big Cross on the Highest Peak |
PLAN-15 | N/W - Prayer House (Adjoining the Cross) |
PLAN-16 | N/W - 1 Park as per the present Landscape (inside the Campus) |
PLAN-17 | N/W - Foundation Stone of the Witter Bible College (Fencing & Beautification) |
PLAN-18 | N/W - Construction and Carpeting of Internal Roads inside the Campus. |